October 21, 2008: Upstairs framing continues with framing the outside walls in the back of the house, and sectioning off the different rooms. Oh, what a windy day to be working on the upstairs of a house on a hill!
Friday, October 17, 2008: The concrete Garage floor was poured in the AM, then the upstairs (floor)framing began. By the end of the day a majority of the upstairs sub flooring was in place.
The house is taking shape, inside and out. Each room on the first floor is now sectioned off with 2x4 framing. I can now walk about, getting a feel for the size and flow of the rooms.