Showing posts with label Framing moves upstairs. Show all posts
Showing posts with label Framing moves upstairs. Show all posts

Saturday, October 18, 2008

Framing moves upstairs



Friday, October 17, 2008: The concrete Garage floor was poured in the AM, then the upstairs (floor)framing began. By the end of the day a majority of the upstairs sub flooring was in place.