Fadley Living
Showing posts with label
Garage floor
.
Show all posts
Showing posts with label
Garage floor
.
Show all posts
Saturday, October 18, 2008
Framing moves upstairs
Friday, October 17, 2008: The concrete Garage floor was poured in the AM, then the upstairs (floor)framing began. By the end of the day a majority of the upstairs sub flooring was in place.
Older Posts
Home
Subscribe to:
Posts (Atom)